November 26, 2026 – BYD has entered exclusive negotiations to acquire the Hambach vehicle plant in Moselle, France, from INEOS Automotive, and French President Emmanuel Macron has publicly confirmed that BYD is working with France on an industrial footprint in the region. The confirmation raises the project’s political visibility, but it does not mean the deal has been signed or closed.
BYD said the proposed transaction still requires consultation with the relevant employee representative body. The company has framed the plan as a way to keep the plant operating, support local jobs, and produce vehicles for European customers. Price, models, capacity targets and production timing have not been disclosed.
Macron said on X that the project is a direct result of France’s economic policy and its European automotive action, a direction signaled during the Paris auto show in October. He added that more details are expected at the Choose France investment summit on January 18, 2027.

INEOS said that if the deal is completed, its Grenadier SUV and Quartermaster pickup would continue to be produced at Hambach for a period, which could create a transitional phase in which both companies use the same site. INEOS has also shortlisted US production options and plans to start manufacturing in the United States in 2028, as about 70% of Grenadier sales are concentrated in the US market.
Hambach carries significant industrial history. The plant was built by Mercedes-Benz and opened in 1997, later becoming associated with Smart production before INEOS acquired it from Daimler in 2020 and began assembling Grenadier vehicles there from 2022. Reported employee numbers differ across sources, with figures close to 900 and around 1,300 both appearing; the final workforce figure should be treated as pending official confirmation.
For BYD, the strategic value is less about immediate volume and more about European localization. If completed, Hambach would become BYD’s second European passenger-car manufacturing base after the Szeged plant in Hungary. A ready-made plant, existing industrial workforce and proximity to the French-German automotive supply chain could shorten the path from market entry to local production, while the remaining questions center on labor consultation, regulatory review, model allocation, supply-chain localization and plant utilization.
